Text Box: Nitrate and Phosphate sequestration from waste water

1. Optimize the system for nitrate and phosphate removal in 2000lit packed bed bioreactor in continuous mode.

2. Small prototype units for actual installation would be developed.

3. Attempts would be made for technology transfer.

4. Carry out detailed mathematical modeling for the system.